AROWRN Beaverlodge Field Trip 2015

Winter harvesting of short rotation willow clones was the focus of the November 2015 Field Day of AROWRN technology.

The site was established as a short rotation willow plantation in 2009. It located adjacent to both the Town of Beaverlodge sewage lagoon and PRT Beaverlodge seedling production facility.  Effluent from the lagoon was delivered as an irrigant for the willow through a drip irrigation system.

Read This Story